Volume & conversion

Cubic Yard Calculator

Calculate cubic yards for a rectangular or circular area, or convert a known volume. Useful for soil, mulch, gravel and other bulk materials.

Created and Written by: Designation: Founder

Technically reviewed by: Riya Kulkarni | BE Civil Engineer

Find your volume

Dimension unit changes convert your measurements. Enter decimals, such as 3.5 inches.

Area dimensions

Volume = length × width × depth. Use constant depth and non-overlapping identical areas. Quantity multiplies the volume of one area.

Optional; use 0% for a straight volume calculation or conversion. An entered percentage adds to the base volume once. Confirm any material-specific allowance separately.

EXAMPLE ESTIMATE
1 yd³

Calculated volume

Equivalent cubic feet
27 ft³
Equivalent cubic meters
0.765 m³
Equivalent liters
764.555 L
Base volume
27 ft³
0% extra material
0 ft³
Volume per area
27 ft³
Identical areas
1

Display rounded to 3 decimals. Calculations use unrounded values. Volume does not determine material weight; density, moisture and compaction vary.

What is a cubic yard?

A cubic yard is a unit of volume: a cube measuring 1 yard on each side. Since a yard is 3 feet, that cube contains 3 × 3 × 3 = 27 cubic feet. A square yard measures area and needs a depth before it can become a volume.

Calculate from dimensions

For a rectangular area, volume = length × width × depth. For a circular area of constant depth, volume = π × diameter² / 4 × depth. Convert all dimensions to the same length unit before multiplying. This calculator supports a separate unit for each measurement and converts internally to feet.

Multiply the volume of one area by the number of identical, non-overlapping areas. Use quantity 1 when the dimensions already represent the full combined space. Divide the resulting cubic feet by 27 for cubic yards.

Worked example: a shallow rectangular bed

A 12 ft × 9 ft bed at a uniform 3 in depth has a depth of 3 / 12 = 0.25 ft. Volume = 12 × 9 × 0.25 = 27 ft³ = 1 yd³ = 0.764554857984 m³. Two identical beds require 2 yd³ before any extra material.

Convert a known volume

Choose Convert a known volume when you already know the quantity in cubic feet, cubic yards, cubic meters or liters. The volume unit selector retains your numeric entry; choose the unit that matches it. No shape or repeated-area inputs apply in this mode. A volume of zero converts to zero.

Conversions: yd³ = ft³ / 27; yd³ = m³ / 0.764554857984; yd³ = liters / 764.554857984. One cubic foot equals 0.028316846592 m³. One liter equals 0.001 m³. These use the international foot and yard.

Optional extra material

The calculator starts at 0% extra so it reports geometric volume directly. If you choose an allowance, total = base volume × (1 + extra / 100). For example, 10% extra on 1 yd³ gives 1.1 yd³. Extra material is added once after any identical-area quantity.

Use the allowance agreed for the material and application. This tool does not automatically model soil swell, settlement, compaction, moisture or delivery increments. If a supplier sells whole or fractional yard increments, confirm the final order quantity separately.

Volume and weight are different

The same cubic-yard volume can weigh different amounts for soil, mulch, gravel or other materials. A weight calculation needs a suitable bulk density and moisture basis. This page estimates volume only. Irregular stockpiles, sloped surfaces and varying depths need a different geometric takeoff or several non-overlapping measurements.

Related tools

For concrete-specific section takeoffs use the Concrete Calculator. For a rectangular slab with openings and perimeter edges use the Concrete Slab Calculator. For general unit conversions use the Unit converter.

Reference

NIST SP 811: conversion factors provides the unit-conversion basis. The cubic-volume factors above are derived from 1 ft = 0.3048 m and 1 yd = 0.9144 m.

Related calculators

All calculators

TECHNICAL REVIEWER

Riya Kulkarni | BE Civil Engineer

Riya Kulkarni qualifications and experience
QualificationBE Civil – Shivaji University, Kolhapur (2018)
Experience8+ Years
Technical SpecialisationsStructural Engineering, Construction Materials, Site Execution and Concrete Technology.

Project experience

1. Shree Ganesh Residency

Location: Rajarampuri, Kolhapur

Project Type: G+4 Residential Apartment Building

Technical responsibilities
  • RCC structural construction coordination.
  • Reinforcement and shuttering inspection.
  • Concrete pouring and curing supervision.
  • Monitoring construction materials and workmanship.
  • Site quality-control documentation.

2. Vrindavan Heights

Location: Tarabai Park, Kolhapur

Project Type: G+5 Residential Building

Technical responsibilities
  • Structural drawing interpretation.
  • Reinforcement detailing checks.
  • Concrete workability and placement monitoring.
  • Construction sequencing and site coordination.
  • Building material quality assessment.

3. Sai Krupa Row Houses

Location: Kalamba Road, Kolhapur

Project Type: Residential Row Housing Development

Technical responsibilities
  • Foundation and plinth construction coordination.
  • Brick masonry and plastering inspection.
  • Concrete mixing, placement and curing.
  • Waterproofing and finishing work coordination.
  • Construction progress documentation.

4. Greenview Enclave

Location: Ujalaiwadi, Kolhapur

Project Type: G+3 Residential Apartment Complex

Technical responsibilities
  • Site execution monitoring.
  • RCC work and reinforcement inspection.
  • Construction material management.
  • Concrete quality testing coordination.
  • Workmanship and quality documentation.

5. Lotus Business Plaza

Location: Shahupuri, Kolhapur

Project Type: G+3 Commercial Building

Technical responsibilities
  • Structural construction coordination.
  • Slab and column reinforcement inspection.
  • Concrete placement and quality monitoring.
  • Construction activity sequencing.
  • Contractor and site-team coordination.

6. Omkar Residency

Location: Kadamwadi, Kolhapur

Project Type: G+5 Residential Apartment Building

Technical responsibilities
  • Foundation and superstructure execution coordination.
  • Reinforcement and formwork inspection.
  • Concrete testing and curing monitoring.
  • Material specifications and quality checks.
  • Site inspection reporting.

7. Silver Oak Villas

Location: Kasaba Bawada, Kolhapur

Project Type: Independent Residential Villa Development

Technical responsibilities
  • Residential foundation construction.
  • RCC structural component inspection.
  • Masonry and plastering quality checks.
  • Flooring and finishing coordination.
  • Site execution and material monitoring.

8. Pratham Commercial Complex

Location: Ruikar Colony, Kolhapur

Project Type: Commercial and Retail Building

Technical responsibilities
  • RCC construction coordination.
  • Concrete quality-control procedures.
  • Structural component inspection.
  • Construction material assessment.
  • Execution progress and quality reporting.